Monday Feb 13 5:00-9:00 Today I mainly worked on building the device that protect our motor if the automaton regurgitate sideways. Collin and I worked on fabricating the lexan. We got it mounted that night. I cleaned by waver around the band saw and cleaning all the break that was around and on it. Wednesday Feb 15 6:00-8:00 Today I made a few covers to put over the electronics. about trimming had to be through with(p) so the ball could take up up smoothly. I was able to come in that done easily. I left after sweeping the shop floor. atomic number 90 Feb 7:00-9:00 Today I helped Avery build a photographic camera mount. It wasnt lightheaded to fabricate but I got it by the end up of the night. I organized the wire area a little. Saturday 12:45-5:00 On this day I mainly served for people by shrink tools and materials. I spent a visual sense of metre grind screws to the correct length.
It took a long time because the screws get actually hot. I ate and move the floor. Sunday 1:45-2:30 Arrived and cleaned pretty much. I helped adjust parts on the robot with Nolan and left. Monday 12:30-4:45, 6:00-7:30 Mainly I worked on the sic switches for the bridge manipulator. I took a lot longer than it necessary to. At the end of the night we frame that the robot didnt sine qua non the part I worked on. Oh well. I swept the floor.If you want to get a full essay, order it on our website: OrderEssay.net
If you want to get a full information about our service, visit our page: write my essay
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.